The Tech - Online EditionMIT's oldest and largest
newspaper & the first
newspaper published
on the web
Boston Weather: 58.0°F | Partly Cloudy
A 3D rendering of the new bicycle racks and repair stand outside the Stratton Student Center, Building W20. This view from the southeast corner shows the proposed location of the repair stand, which will be installed in March. The racks go in today.
Source: Adam Serafin, Facilities
A 3D rendering of the new bicycle racks and repair stand outside the Stratton Student Center, Building W20. This view from the southeast corner shows the proposed location of the repair stand, which will be installed in March. The racks go in today.

See Article: News Briefs