The Tech - Online EditionMIT's oldest and largest
newspaper & the first
newspaper published
on the web
Boston Weather: 25.0°F | A Few Clouds and Breezy
Students sit atop a plinth in the corner of Lobby 7 as pedestrians walk past on Nov. 5. The Class of ’54 will be holding a student contest for designs to sit atop the pedestals, which were left unfinished after Lobby 7 was built in 1939.
Students sit atop a plinth in the corner of Lobby 7 as pedestrians walk past on Nov. 5. The Class of ’54 will be holding a student contest for designs to sit atop the pedestals, which were left unfinished after Lobby 7 was built in 1939.